Concrete Calculator
Accurately estimate cubic yards, cubic feet, and exact bag counts (80 lb, 60 lb, 50 lb) for slabs, patios, post hole footings, and stairs with contractor waste allowance.
Tool not found: concrete-calculator
How to Use the Concrete Calculator
- 1Select structure type: Slab / Patio / Driveway, Column / Post Hole, Trench Footing, or Stairs & Steps.
- 2Enter dimensions in feet and inches (length, width, thickness, diameter, depth, or rise/run).
- 3Adjust the contractor waste margin slider (10% is industry standard for uneven soil subgrades).
- 4View required volume in cubic yards, cubic feet, and cubic meters.
- 5Check exact pre-mix bag counts (80-lb, 60-lb, 50-lb) and delivery vs. bag recommendations.
- •Running short on concrete causes cold joints that compromise structural integrity; always order at least 10% extra.
- •For pours exceeding 2 cubic yards (90+ bags of 80 lb), ordering ready-mix transit truck delivery saves substantial labor.
About the Concrete Calculator
Pouring concrete requires exact volumetric planning. Unlike lumber or framing materials that can be easily returned or modified on site, mixed concrete hardens within 90 minutes. Running short leaves cold seams and structural flaws, while over-ordering results in expensive disposal fees.
Our Concrete Calculator provides accurate volume estimates for DIYers and professional contractors alike. It covers rectangular slabs, circular cylinder footings and fence post holes, continuous trench footings, and cast-in-place stairs, outputting both cubic yardage for truck orders and bag counts for retail purchasing.
Formulas for Concrete Volume Calculations
Concrete is ordered by volume in cubic yards (1 cubic yard = 27 cubic feet):
- Slab Volume: (Length ft × Width ft × [Thickness in ÷ 12]) ÷ 27 = Cubic Yards
- Cylinder / Post Hole: (π × [Radius in ÷ 12]² × [Depth in ÷ 12]) ÷ 27 = Cubic Yards
- 80-lb Bags: Total Cubic Feet ÷ 0.60 cu ft per bag
- 60-lb Bags: Total Cubic Feet ÷ 0.45 cu ft per bag
- 50-lb Bags: Total Cubic Feet ÷ 0.375 cu ft per bag
Worked Patio Slab Example
- Dimensions: 10 ft length × 10 ft width × 4 inches thick.
- Calculate cubic feet: 10 × 10 × (4 ÷ 12) = 33.33 cu ft.
- Convert to cubic yards: 33.33 ÷ 27 = 1.23 cubic yards.
- Apply 10% waste: 1.23 × 1.10 = 1.36 cubic yards.
- Compute 80-lb bags: (33.33 × 1.10) ÷ 0.60 = 61.1 => 61 bags required.
Total required: 1.36 Cubic Yards (or 61 eighty-pound bags of pre-mix concrete).
Concrete Bag Yields Reference Table
Concrete Bags Required per Cubic Yard & Common Slab Sizes
| Bag Size | Yield per Bag | Bags / Cubic Yard | 10×10 Slab (4" Thick) |
|---|---|---|---|
| 80 lb (36.3 kg) | 0.60 cu ft | 45 Bags | 61 Bags (with 10% waste) |
| 60 lb (27.2 kg) | 0.45 cu ft | 60 Bags | 81 Bags (with 10% waste) |
| 50 lb (22.7 kg) | 0.375 cu ft | 72 Bags | 98 Bags (with 10% waste) |
Based on standard ASTM C387 packaged concrete compressive strength standards.
Who Uses This Calculator?
- ✓Homeowners pouring DIY backyard patios, shed slabs, and sidewalk walkways
- ✓Fence and deck contractors sizing Sonotube cylindrical post holes and footings
- ✓General contractors scheduling short-load transit mix deliveries with concrete dispatchers
- ✓Masons building concrete steps, curbs, and foundation stem walls
Limitations & Concrete Pouring Tips
Known Limitations
- •Assumes a flat, level excavation subgrade; rutted or uneven dirt subgrades consume additional volume.
- •Does not estimate reinforcement rebar, wire mesh, or gravel subbase quantities.
- •Ready-mix delivery dispatchers typically charge short-load fees on orders under 4–5 cubic yards.
Pouring Best Practices
- →Always order at least 10% extra concrete to avoid cold joint seams caused by running short.
- →Compact 3 to 4 inches of crushed gravel base prior to pouring for proper water drainage.
- →Moist-cure concrete with plastic sheeting or light water misting for at least 5 to 7 days.
Frequently Asked Questions
- How do you calculate how much concrete you need?
- Multiply Length (ft) × Width (ft) × (Thickness in ÷ 12) to get cubic feet, then divide by 27 to obtain cubic yards. Always add 10% for contractor waste and excavation settling.
- How many 80-lb bags of concrete are in a cubic yard?
- There are 45 eighty-pound (80 lb) bags of concrete in one cubic yard. Each 80-lb bag yields approximately 0.60 cubic feet of mixed concrete: 27 ÷ 0.60 = 45 bags.
- How many 60-lb and 50-lb bags make a cubic yard?
- One cubic yard requires 60 sixty-pound (60 lb) bags (27 ÷ 0.45 = 60) or 72 fifty-pound (50 lb) bags (27 ÷ 0.375 = 72).
- When should I order a concrete truck instead of bags?
- Projects requiring under 1.5 cubic yards (under 65 bags) are practical to mix by hand. Projects requiring 2 cubic yards or more (90+ bags) are much faster and more consistent when ordered via ready-mix truck.
Looking for more building & math tools? Browse all Calculator Tools
More Calculators
Square Footage Calculator
Calculate square footage for rooms, flooring, tile, landscaping, and homes. Supports multiple rooms, rectangles, circles, triangles, L-shapes, waste margin, and cost estimation.
Pool Volume Calculator
Calculate how many gallons or liters are in your pool. Free pool volume calculator for rectangular, round, oval, and kidney-shaped pools.
You Might Also Like
Tip Calculator
Calculate tips and split bills free online. Enter your bill total, tip percentage, and number of people to instantly see tip amount and per-person cost.
Percentage Calculator
Calculate percentages, percentage change, and what percent one number is of another. Free online percentage calculator for everyday math.
Word Counter
Count words, characters, sentences, and paragraphs instantly. Free online word counter tool with reading time estimate for writers and students.
Concrete estimates are for planning and ordering. Confirm site forms and soil subbase elevations prior to placing orders.